Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > General Talk
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 11-13-2008, 01:21 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
New Portable Show Layout Update

The general construction of our clubs new two module show layout is nearing completion. All wood framing with backdrop board installation has been completed. The 4-inch foam base is being installed.

All projected track supplies have been ordered and should be in at anytime.

Two DCC universal plugin panels have been acquired.

Hopefully through this coming weekend, the foam installation will be complete and the end boards with hand grips/wheels will be fabricated and installed. These end boards are to enclose the module ends when clam shelled together.

Once the foam is in place the next phase of track layout/installation will begin.
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
  #2  
Old 01-24-2009, 04:56 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
Smile Re: New Portable Show Layout Update

I'm passed due providing an update to the portable train layout construction. The holiday season put me on vacation from train stuff but now things are on a roll again.

We now have a boxed set of modules that are only lacking the end shipping panels (and the layout...). The pictures show the travel and setup modes. Note that I alone unboxed and setup the modules. Now moving and loading into vehicles without help would be a bit more of a challange...
Attached Images
  
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
  #3  
Old 01-24-2009, 09:53 PM
TNRkitect TNRkitect is offline
Senior Member
 
Join Date: Dec 2007
Location: Huntsville, AL
Posts: 246
Re: New Portable Show Layout Update

Don't look so thrilled.
Reply With Quote
  #4  
Old 01-25-2009, 03:29 PM
Phil Brooks's Avatar
Phil Brooks Phil Brooks is offline
Senior Member
 
Join Date: Aug 2005
Posts: 101
Re: New Portable Show Layout Update

That looks great, Bruce!

Looks like we'll be laying track pretty soon...

Thanks for all the hard work,

-Phil
__________________
Model Railroading means..."A Money-Pit filled with Trains"
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 07:26 AM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.