Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > N / Z Scale Division
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 10-30-2009, 10:35 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
N-Scale Gathering: November 1

During our KAMRI 1st Sunday gathering us N-Scalers will be having track modification discussions. We are planning a transition from a three track main layout down to a two track main. This is part of our effort to develop better operating scenario's under DCC control.

Phase 1 of this transition will be to remove a high percentage of the outside (#1) mainline. Some of this trackage will be used for passing sidings or industrial spurs. This will require installing 5 additional switches.

Phase 2 will be to add a new yard parallel to the existing yard. This will be the big cost item as this would require purchasing approximately 14 new switches.

Concurrent to the above efforts we will need to inventory the rolling stock and go through a quality inspection. This is to ensure all selected cars will perform equally and with minimum operating issues. At this time we do have extra rolling stock on the layout that is mostly for dispay purposes. However, the quantity is too high and would not allow for good operations.

Hope to see you Sunday!

Bruce
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 01:48 PM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.