Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > N / Z Scale Division
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-12-2007, 01:44 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
Log'n Camp Layout Addition

The KAMRI N-Scalers are git-n-r done one layer of foam at a time. I'm refering to our planned entension of the peninsula loop module that will add a spur into a logging camp area. For reference refer to the picture of the layout design in the July Scoop (News and Announcement Archive).

We contructed a plywood base that attaches to the under side of the existing module 1x4's. We added a stiffener and a new support leg. This gives platform for just building up the terrain initially using 2-inch thick foam sections. I though I'd post periodic photos to give an idea of how things are going.

The first shot is basically the original loop module with the beginnings of the logging camp spur. The second photo is a shot of what was accomplished at our 5th Sunday of July gathering.
Attached Images
  
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 04:33 PM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.