Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > N / Z Scale Division
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-02-2007, 01:28 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
N-Scale Gathering: March 4

Your coordinators first priority is to inspect the tracks for any additional damage from the cold dry spell. Hopefully, some of the areas have reverted back into their original positions. If so we can reglue, nail, staple, hammer, or whatever we need to do to better secure these tracks. We also will need to assess cutting some expansion gaps in the rails and possibly exchange the Atlas 5-inch connector tracks with flextrack pieces.

After all of that mess, we should be able to get back into our ongoing routine projects and such. OUr own Phil Brooks is a birthday boy this weekend and his status (for potentially bringing bagels) is iffy.

We also need to recheck the latch alignment on our doorway from the n-scale room out into the hands on room. As previously noted, the weather caused this doorway out of plumb and is wouldn't latch without significant presuasion.

See ya'll Sunday!
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 01:07 PM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.