Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > N / Z Scale Division
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 10-10-2010, 03:45 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
KAMRI N-Scale Layout Mods

Our upcoming KAMRI gathering is also the 3rd Sunday open house so be prepared to wow the public.

Also, we now have in hand a number of new switches to start our n-scale layout modification from a 3-track main (aka N-Trak standards) into a 2-track main. I suggest that we do this work in stages initially and see how the layout can be operated. The following two kitbashed photos show the first phase of the transformation. This installation will isolate most of the outside (red line or #1) main with the exception of 2 switches on the industrial modules.

I realized that with the installation of just two switches that we essentially end up with a branchline. by this I mean that to service the ice house and other neighboring industries you will have to access the track from the industrial modules and drive on around the outside track to get there. By adding a short runaround track at that location this makes for an interesting operating scenario.

See y'all Sunday!
Attached Images
  
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 03:36 AM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.