Knoxville Area Model Railroaders Forums  

Go Back   Knoxville Area Model Railroaders Forums > KAMR Talk > N / Z Scale Division
User Name
Password
Home Forums FAQ Members List Calendar Search Today's Posts Mark Forums Read


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 05-31-2006, 10:31 AM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
June 4th: 1st Sunday N-Gathering

The plan? I don't have one this time except for arriving by 12:30 pm. I will attempt to initially work on the dam and proceed to checking the inner track electrics of the peninsula reversing loop.

I hope to come up with an extension cord for the peninsula transformer to re-establish local operations. The cord should be long enough to reach back to the outlet strip used for the main layout power supply. It just occurred to me that we should also transfer the power cord for the carnival to this strip as well. This would assure deactivating all layout components (if we remember to shut off the strip ).

I am assuming that others will continue with their associated projects such as Bagelton development and the NG base. The new overpass work will be on hold until the base entrance has been installed.

I had a thought on the quarry module #1 mainline track issue I mentined in earlier postings. Instead of tearing up the track due to a small dip on the outside rail, I wonder if it could be built up with a bead of solder and sanded smooth? It sure would be a lot less work.

See ya'll Sunday!
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -4. The time now is 03:06 PM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.