View Single Post
  #1  
Old 11-13-2008, 01:21 PM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
New Portable Show Layout Update

The general construction of our clubs new two module show layout is nearing completion. All wood framing with backdrop board installation has been completed. The 4-inch foam base is being installed.

All projected track supplies have been ordered and should be in at anytime.

Two DCC universal plugin panels have been acquired.

Hopefully through this coming weekend, the foam installation will be complete and the end boards with hand grips/wheels will be fabricated and installed. These end boards are to enclose the module ends when clam shelled together.

Once the foam is in place the next phase of track layout/installation will begin.
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote