Re: Log'n Camp Layout Addition

Here's my next update report and picture on the logging camp addition of work completed during our August 5 Sunday gathering. The layering of foam up to the primary grade of the spur has been installed. Track sections/switches were placed to simulate the most likely route for this project. The trackage will include a short runaround track and a back facing spur into to an engine shed and barracks/shop for the loggers. It sure looks like a thick layering of foam but much of this is required in order to carve/shape the valley that will remove a bunch of material.

The next effort at our August 18 gathering will be to build the mountain ridge over the double track looping main. Thus we will have a second tunnel on our layout.

Stay tuned for my next update.
Attached Images
 
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote