View Single Post
  #1  
Old 08-02-2007, 08:29 AM
McToots's Avatar
McToots McToots is offline
Administrator
 
Join Date: Aug 2005
Location: Kingston
Posts: 511
N-Scale Gathering: August 5

We made leaps and bounds with the new peninsula loop module extension at our last gathering. The extension that's complete with a support leg and the first 2 inch layer of styrofoam has been installed. At our upcoming Sunday gathering we'll continue installing the styrofoam to buildup the base terrain. The existing structures on the loop module will need to be removed and put in storage. This will allow further foam installation to build the tunnel over the existing loop module tracks. We may want to modify the leg with the installation of an adjustable foot. This will allow fine tuning the support of this addition and comphensate for floor irregularities.

The new icing house and Schalls Printing have been roughly sited and track siding right of ways identified. This is the first step in improving hte lay of the land aroung our 'Blue Rigde Mountains'.

See ya'll Sunday!
__________________
Bruce (McToots) McElhoe
KAMRI President
and Web Site Moderator
Reply With Quote