Design/Build Stimulus Trackage
1 Attachment(s)
What do you get when you cross engineering, graphic design, finance, upper managment, and stimulus package money with strings attached when building a trestle?:confused:
I'm not sure. But as the picture shows, it may be a bit presumptuous to conclude that this is the answer to our problems of how to get from point A to point B.:o |
All times are GMT -4. The time now is 10:46 AM. |
Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.